Category Archives: design

Planning granted for transformative extension

Tuesday, April 10th, 2018

We have recently secured planning permission from South Oxfordshire District Council for a house extension project in the market town of Thame.
Our client has recently purchased the semi-detached dwelling which is in need of considerable updating and renovation work, both inside and out. The aspiration is to create an extra bedroom and a larger, lighter modern kitchen and living space.
Our design involves removing a small existing single storey extension, and replacing it with a ‘wrap around’ part single and part two storey extension. This not only delivers the required extra bedroom and stylish ground floor living space, but also improves the appearance of the house from the rear garden.

Together with a more general renovation of the dwelling, the extension will transform it into a stunning family home. Our client is going to project manage the build himself, and we look forward with anticipation to seeing the project when completed later this year.

From Vision to Reality

Wednesday, February 21st, 2018

In the ever changing world of technology, architectural CAD software has moved on significantly since the days of the drawing board.

The most current software has revolutionised the way we work. State of the art software forms part of the Building Information Modelling (BIM) system, which allows the sharing of design information between all parties involved in the construction process.

We can work in 2D whilst the software builds the design into a three dimensional (3D) model, giving clients a clearer idea of the design concept.

Here in the office we have gone a step further. By using a 3D printer, we are able to bring to life the 3D model by producing a small scale building model. This gives clients the chance to pick up, turn around and inspect their concept design.

The pictures show how for one client the design concept has become a reality in 3D.

 

Residential Extension Gets Off the Ground

Thursday, February 15th, 2018

Work has recently begun on a new part two-storey, part single storey rear extension for a residential client in Buckinghamshire. The aspiration for this 3-bedroom semi-detached dwelling is to create a new first floor master bedroom and a larger open plan kitchen and dining area on the ground floor, which will be achieved by removing an outdated conservatory and replacing it with a modern, light extension.

The homeowners approached us to produce the construction drawings, specification and to administer the process of obtaining and evaluating quotes from suitably qualified local builders.

Materials such as roof tiles and bricks are to match the original dwelling and there will be a zinc roof on the single storey element. Party Wall matters have also been dealt with.

We anticipate that the extension will be completed by the end of May.

 

Timber Building is Awarded A-Rated EPC

Wednesday, January 24th, 2018

We were extremely pleased to learn last week that a recent project has been awarded an A-Rated Energy Performance Certificate (EPC). Our client was the National Trust; we recently completed the design and carried out project management for an extension to their Estate Office building at Ashridge Park near Tring. This included new offices and meeting room, and extensive alterations to the existing structure to create a new internal layout.

EPCs are awarded based upon the energy efficiency rating on a scale from G (less energy efficient) to A (more energy efficient). The refurbished and extended building saw a significant improvement due to higher levels of insulation, introduction of LED lighting and a new biomass boiler which has been installed.

Fewer than 1% of commercial premises achieve an A rating so this is a very positive result. To find out how we can help improve the energy performance of your building then please do get in touch.

 

Construction Begins at Henlow Academy

Tuesday, January 9th, 2018

We reached an important milestone last week when members of our team made the first site visit to a new development project at Henlow Academy in Bedfordshire. This is following our successful application to Central Bedfordshire Council for planning permission on behalf of the Academy, to a building design we had produced.

Construction has begun on a four-court sports hall and new classrooms, which will form the cornerstone of a larger site development project. We have already overseen the construction of a link extension and internal alterations to the main building in 2017, but the Academy will benefit still further from the latest increase in sports provision and additional teaching space.

The principal contractor, Borras Construction, has made a start on foundation trenches with the first inspection completed by Central Bedfordshire Council Building Control. We are looking forward to seeing progress as we oversee the construction throughout the nine month build period.

Science Laboratory Refurbished

Monday, November 6th, 2017

Henlow Academy undertook a number of improvements to their site over the summer. These included a link corridor extension to improve dining facilities, and also internal alterations to a couple of classrooms and the science laboratory.

We were brought in at the beginning of the project by the Academy’s Headteacher, Caren Earp. Our involvement included preparing drawings, administering the planning application and building control process with Central Bedfordshire Council, creating the technical design and specification, and subsequently the procurement and contract administration of the builders.

The first floor science room refurbishment presented some interesting technical and logistical challenges. A specialist laboratory furniture company was brought in to design and install a new bench configuration to increase the workstation capacity. The gas supply to the lab was also upgraded.

A new bright coat of paint has completed the refurbishment scheme, and the Academy is now well-equipped to cover the science part of the curriculum in the future.

New Lodge Classroom

Friday, October 27th, 2017

WP_20170920_14_48_19_Pro
We have recently completed our second project on the site of St Mary’s Catholic Primary School in Caddington. The school was seeking to provide extra accommodation for some of the pupils as a break-out space. Our suggestion was a neat single classroom unit in the form of a timber lodge, with a simple internal space suitable for teaching smaller groups. Fit-out costs were kept to a minimum, and the building is kept warm with electric storage heaters, avoiding the need for expensive service connections.

In addition, the lodge is environmentally-friendly with the use of a timber frame, cladding and recycled building products, as well as low energy lighting. Construction firm JET Construction were respectful and efficient, as well as accommodating last minute requests from the client, creating a well-finished learning environment.

The school is delighted with the new lodge building, and is already seeing the benefits of having the extra independent classroom space.

Another Planning Permission Secured

Friday, October 6th, 2017

Woking B C Logo #2

One of our residential clients with a detached house in West Byfleet has recently been granted planning permission by Woking Borough Council for a new garage and workshop.

This is a slightly challenging site, as the current asbestos-clad garage (which is old and unattractive) forms part of the boundary with the next door neighbour. A good case had to be made to the local planning authority; our design has a pitched tiled roof to make it neater and more linear, and the building will be timber clad which will smarten up the appearance for both the homeowner and their neighbour, replacing the current old concrete walls.

The new building will offer superior useful storage space, and enough headroom for a modest workshop.

New Pre-School Holds Official Opening

Friday, September 22nd, 2017

IMG_4712Parents and children were invited along to attend the official opening of a brand new pre-school building, which has just completed on the site of Clophill St Mary’s Lower School in Bedfordshire. PCMS Design has been involved in this project since its inception, working together with the school governors and management team on the design, planning application process, specification, tendering and finally the contract administration of the build.

There is a large bright playroom with kitchenette, plus a small admin area with office and store room. As the pre-school is on the site of a former Victorian school building, the design reflects some of those features with brick elevations and a slate roof, and tall feature windows at the end of the play room.

The official opening ceremony was attended by the Bishop of Bedford the Rt Revd Richard Atkinson, and staff are now preparing for the first wave of pre-schoolers.

Headteacher Karen Bingley said: “We were so pleased today to officially open our new pre-school building, which is a superb addition to the school site. PCMS Design has looked after the whole project for us, and assisted particularly in the later stages with contract administration. We now have a beautiful and well-designed building for our pre-school children, and the whole community will benefit from it for years to come.”

IMG_4717 adjusted for PR IMG_4708 Reduced

Development at Henlow Academy Given Green Light

Thursday, September 14th, 2017

Henlow Academy LogoFollowing months of preparation, our team was very pleased yesterday when Central Bedfordshire Council’s Development Management Committee granted planning permission for the construction of a four-court sports hall with associated changing rooms, and also six new classrooms over two storeys at Henlow Academy in Bedfordshire.

This is a notable achievement for the Academy, which is seeking additional space to accommodate a temporary increase in pupil numbers over the next 3-4 years. It means that Phase II of the Academy’s site development programme can now go ahead. Phase I, which included a new link corridor and refurbishment works to several classrooms, was carried out this summer.

In addition to the sports hall, which will allow the Academy to substantially expand the range of sports on offer to pupils and the wider community, there will be improvements to the on-site car park, school bus bays and nearby public highway.

We are now looking forward to working with the Academy on the project management of the next stages, with a view to the classrooms being in operation for the 2018 academic year.